ISO 27001 risk register: what your auditor expects

The standard never uses the words “risk register”. It asks you to assess your information security risks in a repeatable way, decide what to do about each one, and keep a record. A register is how nearly everyone keeps that record. This page sets out what the record has to show.

What the standard asks for

Four clauses of ISO/IEC 27001:2022 shape the register.

  • Clause 6.1.2, risk assessment. Set your criteria first: how you score likelihood and impact, and what level of risk you accept. Then identify the risks to the confidentiality, integrity and availability of the information in your scope, name an owner for each, score them, and rank them against your criteria. The method has to give comparable results each time it is used.
  • Clause 6.1.3, risk treatment. Choose what to do about each risk and the controls that needs. Check those controls against Annex A so that nothing necessary is left out, and record the result as a Statement of Applicability. Write a treatment plan, and have each risk owner approve it and accept the risk that remains.
  • Clause 8.2. Repeat the assessment at intervals you set, and when significant changes are proposed or happen.
  • Clause 8.3. Carry out the treatment plan, and keep the results.

You do not have to start from a list of assets. Any method that gives consistent, valid and comparable results is acceptable, for example starting from events or scenarios (what could go wrong, and to which information).

What goes in each row

  • A reference and a plain description of what could happen, and to what.
  • The risk owner: a named person or role who can decide about it.
  • The inherent score: likelihood and impact before your controls, with a sentence on why.
  • The treatment: mitigate, accept, transfer or avoid, with the reason.
  • The controls that treat it, each traceable to your Statement of Applicability.
  • The residual score: likelihood and impact with those controls working.
  • The owner's acceptance of the residual risk, with a date.
  • The next review date, and a history of what changed and when.

See three rows filled in.

Five things auditors check

  • The criteria came first. A written method, with scales and an acceptance level, dated before the scores it produced.
  • Every risk has an owner. A person or a role, not a department.
  • Residual risk is accepted. By the owner, on a date, for each risk.
  • Controls trace both ways. From each risk to its controls, and from each control in the Statement of Applicability back to a risk or another stated reason.
  • The register is alive. Review dates that have been kept, and changes that follow incidents, new systems and new suppliers.

The last is where registers most often fail. A register written for the first audit and not opened since is easy to spot from its dates.

How Risk Register covers it

  • On every plan, including Free: 5×5 scoring, an owner field and a review date for every risk, inherent and residual scores, the four treatments with a recorded reason, treatment actions with owners and dates, controls linked to risks, a risk appetite, formal acceptance by a named person with an end date, and a history of every change to each risk.
  • Also on every plan: a health check that says which risks are overdue for review or missing an owner, and export to CSV, Excel, JSON and PDF.
  • On Team and above: the risk documents an auditor asks for (your risk assessment methodology, which defines every score level, and an audit pack with the register, heat map and linked controls in one PDF), a draft Statement of Applicability built from the register for you to complete, review reminders by email, and auditor access that does not count towards your users. See pricing.

Risk Register keeps the risk records only. It does not hold your scope, policies, internal audit or management review. If you are starting from nothing, a documentation toolkit or a full ISMS (information security management system) tool covers those, and you can keep the register here alongside it.

You can write the register yourself, import the spreadsheet you already have (how importing works), or start from the information security template.

Start your register

No card. The Free plan holds 3 registers and up to 300 live risks, and exports to CSV, Excel, JSON and PDF.

Questions

Does ISO 27001 require a risk register?

Not by name. It requires you to keep documented information about your risk assessment and risk treatment processes and their results, including a Statement of Applicability and a risk treatment plan. A risk register is the usual way to hold the assessed risks and what you decided about each, and it is what an auditor will expect to be shown.

Do we need an asset-based risk assessment?

No. Since the 2013 edition the standard has not required an asset-based method. Any method is acceptable if it is written down, gives consistent, valid and comparable results when repeated, and gives each risk an owner; many organisations start from events or scenarios. Annex A still lists an inventory of information and other assets as a control.

How often does the register need reviewing?

At intervals you decide and write down, and whenever something significant changes, such as a new system, a new supplier or an incident. Many organisations review every risk at least once a year and their highest risks more often.

Can we keep the register in a spreadsheet?

Yes. The standard does not ask for software. The difficulty with a spreadsheet is showing who changed what and when, and keeping review dates and sign-offs current. If you have one already, you can import it.

Will using Risk Register make us certified?

No. Certification is decided by an accredited certification body after an audit of your whole management system. Risk Register keeps the risk assessment and treatment record that the audit will look at.

This page describes ISO/IEC 27001:2022 in our own words and is not a substitute for the standard. Risk Register is not affiliated with ISO or with any certification body. Whether your register meets the standard is decided by your auditor.